We are in the process of purchasing our first ever home in CA and we just discovered in the disclosures that the new build property we are purchasing previously had a swimming pool which was filled without an engineer onsite to approve the work (details from disclosure below). Is this something we should be concerned with or not? Is it something we should have additional inspections conducted on?
We are originally from the UK and not really sure what to do with this information and if it is concerning or not.
A POOL DID EXIST PREVIOUSLY. COPING, TILE, GUNNITE AND REBAR WERE ALL REMOVED AND DIRT AND CLEAN DRAIN ROCK WERE USED TO FILL IT IN.
COMPACTED FILL WAS NOT USED AND NO ENGINEER APPROVED THE DIRT AND DRAIN ROCK FILL IN
[link] [comments]
source https://www.reddit.com/r/RealEstate/comments/dpyzw8/pool_fill_without_engineer_oversight/
Comments
Post a Comment